Wednesday, 25 April 2012

REPAIR WORK IN PROGRESS




Encik Shukri helped to tidy up the wires of the MRCB box in the Power Control Room of the library.  Under the 5S system all wires must be neatly arranged and repairs must be made to faulty equipment as soon as possible.

No comments:

Post a Comment